In Part One of this article, I described the unfortunate events of 25 September 2021, and the start of a mass crustacean mortality on Teesside. In Part Two, I’ll talk about what happened in the six years that led up to that event.
Politics and regeneration, an unhealthy cocktail
Following the shocking closure of Redcar steelworks in October 2015, the South Tees Development Corporation (STDC) was created in an attempt to regenerate the local economy. with a mission to remediate former steel sites, sell them to investors, then re-invest the profits in further remediation. This would have created a virtuous cycle which would eventually have seen all 2,000+ acres of land made available for development
An explicable deal
But, in January 2021, the impetus behind the regeneration switched from the public sector to private wealth with the formation of Teesworks Ltd. A series of inexplicable deals culminated with the private company owning more than 1,200 acres of former steelworks land, including the derelict South Bank Coke Ovens
Teesside’s largest scrap metal firm
Teesworks Ltd set about its primary business of scrap metal recovery immediately. This culminated a few months later, in June 2021, with the commencement of the demolition of the main coke oven battery at South Bank. Specialist demolition contractors had started work on the ancillary coke oven buildings, including the by-products plant, two years earlier. More on that later.
Proceed with extreme caution
You need to take extreme care when disposing of any buildings that have been involved in coke production. The highest risk comes from polycyclic aromatic hydrocarbons (PAHs). You’ll have read earlier about how PAHs present extreme hazards to marine plant and animal life. This includes human life too, of course, including cancer risks. Exposure to PAHs has also been linked with cardiovascular disease and poor fetal development. And a friendly reminder that the entire stretch of the River Tees which is subject to dredging contains some level of PAHs.
The chemical industry legacy
Teesside’s past as one of the world’s largest centres for chemical manufacture had left a legacy too. For example, this has led to the presence of polychlorinated biphenyls (PCBs) in the Tees Estuary, which may have been behind an outbreak of seal pup deaths in 2025. Milo Brett wrote an excellent article on this, “Silence of the Seals” for North East Bylines on 21 October 2026. You can read Milo’s article here.
Dorman Long Tower
But back to 2021 and South Bank Coke Ovens. Teessiders weren’t worried about the survival of the centrepiece of the former plant, the Dorman Long Tower. Tees Valley Mayor Ben Houchen, and local MP Jacob Young had promised to fiercely resist any attempts to remove the tower; it would be retained as a symbol of Teesside’s proud legacy as a world-leading iron and steel centre. The 20th Century Society, among others, were relieved that the brutalist behemoth would continue to dominate the Teesside skyline. The tower’s future was guaranteed on 10 September, with a Grade II listing from English Heritage.

You can’t trust politicians
None of the safeguards regarding the Dorman Long Tower were worth the paper they were written on. On 15 September, only five days after English Heritage had bestowed Grade II status on the tower, Jacob Young emailed newly minted “culture” secretary Nadine Dorries and asked her to remove the listing. Hang on Jacob: Weren’t you the tower’s staunchest defender? Two days later, Ben Houchen, who had vowed to preserve the tower as a museum, phoned Dorries and insisted that she should do the bidding of Young. She duly did. Meanwhile, Houchen had commissioned a “dodgy dossier” from engineering consultants WS Atkins based on a cursory inspection of the Dorman Long Tower.

A man on a mission
Houchen cherry-picked the conclusions of the report, without publishing it, and decided that the tower would have to go. He dynamited it in the early hours of 19 September 2021, then published Atkins’ report two days later, when the damage was done. This photo shows the former coke ovens site only weeks after the Dorman Long Tower was removed:

This man won THREE elections?
And so, an appalling sequence of arrogance, philistinism and recklessness drew to a close. Ben Houchen and his fireworks crew had brought over 5,000 tonnes of reinforced concrete crashing down on one of the most contaminated industrial sites in the United Kingdom, a place with a toxic legacy of iron and steel making going back to 1850. The hefty bill for this spree would soon fall due; the perpetrators would walk away without a scratch, and the local bull stopped visiting china shops because he couldn’t compete anymore.
A warning from history
It wasn’t as if the Teesworks cowboys hadn’t already had a warning about the consequences of their rash pursuit of scrap metal and real estate profits. Just two years previously, on 19 September 2019 two demolition workers had been killed in an explosion at this very site. The demolition had proceeded despite advice from the Environment Agency the previous month that NO DEMOLITION SHOULD TAKE PLACE until decontamination was completed. More than seven years after this incident, we still await the Health & Safety Executive (HSE) report into the deaths of John Mackay and Tommy Williams; an act of abject moral cowardice, only magnified by every day which passes without a resolution.
COMAH
Those with knowledge of the heavy industry, and its often toxic legacy will be familiar with COMAH. It refers to the Control of Major Accident Hazards Regulations 2015. COMAH sounds complicated, but it’s just a set of safety rules designed to prevent major industrial accidents involving dangerous substances. By observing simple COMAH rules, site operators can provide a safe working environment and reduce harm to the environment. But you have to observe those rules. The map below shows the consultation zones designated by the HSE in terms of COMAH risk, bearing in mind that the site had been defined by the HSE as an “upper tier” COMAH site, the most dangerous. COMAH regulations are not to be taken lightly; they were introduced in the wake of the Flixborough Disaster, in which 28 people died.
In the red zone
As always, red spells danger, and this applied to “Inner” zones. According to the STDC “the highest level of constraint is the Inner Zone and based on the current Decision Matrix published by the HSE, they would advise against Type 3 development (development for use by vulnerable people) and Type 4 development (very large and sensitive development).
Bullseye
Two circular red COMAH zones can be seen to the left of the map. The bottom one is SBCO, the site of South Bank Coke Ovens. The overlapping circle above this indicates the by-products plant. To the right, Grangetown Prairie is the site of the Cleveland Iron and Steel plant.

The dreaded history bit
Teesside’s very first blast furnace was built at the Cleveland Works in 1850. By the turn of the 20th Century the works was, by some measures, the largest iron and steel plant in the world. Throughout 165 years of continuous operation, numerous coke ovens operated at different times throughout Grangetown Prairie. The last of these to be built, intuitively called the Cleveland Coke Ovens, was built in 1936 and operated until 1976. Cleveland Coke Ovens and South Bank Coke Ovens were very similar, despite being built twenty years apart. Both were designed and built by the same company. But South Bank Coke Ovens easily outlasted Cleveland, with a life span from 1956 to 2015. Unsurprisingly then, with so many coke ovens, the entire Grangetown Prairie site was designated as a red COMAH zone after the last steelworkers left in 2015.
Lackenby
Neighbouring Lackenby was a much more modern steel plant. The steel mills were built in the mid 1950s but the plant that dominated the landscape here, the BOS Plant, wasn’t completed until 1971. The BOS Plant converted iron into steel. But the hazardous steel slag produced by the BOS process is different to the inert slag produced in blast furnaces. Steel slag from the BOS Plant was moved by a conveyor belt to a black lagoon known as the South Lackenby Effluent Management System (SLEMS).
SLEMS – it’s as bad as it sounds
SLEMS is probably the most toxic legacy of the Teesside steel industry. The STDC has given up on trying to remediate it, having at one time considered transferring its waste to High Tip, a massive slag dump next to South Bank Coke Ovens. High Tip is separated from SLEMS by the still operable ICI No2 Landfill. This means that there are three enormous waste dumps in a row, all still here in 2026. So much for land remediation at Teesworks. High Tip now towers over Teesworks’ flagship SeAH Factory, built on the site of the coke ovens.
Water courses
So, you’ve got to watch your step when dealing with the toxic coke oven legacy, mainly from the chemical by-products, coal tar and its ilk. Which makes the following issue even more significant: This entire area is underlain with a complex web of water courses. Old maps of the area reveal numerous streams running north from the Eston Hills to the River Tees, parallel to one another. They’ve got quaint names of obscure origin, such as Knitting Wife Beck. As soon as John Vaughan started building his Cleveland Works in 1850, he had to start diverting waterways around the mills and furnaces.
Going underground
The site expanded in ad hoc fashion and various culverts were necessary to “underground” the streams. By the time that the Cleveland Coke Ovens was built in 1936, the contractors had to create a culvert for the north/south Holme Beck, which ran just west of, and parallel to, the coke oven battery. Just south of Cleveland Coke Ovens, a culvert ran diagonally from south west to north east, connecting Holme Beck to Knitting Wife Beck, traversing the entire Grangetown Prairie Site. This was probably a storm overflow to prevent the coke ovens getting flooding in the event of heavy rain. Here’s a close up map of the watercourses.

Where does the water flow?
Given the extremely toxicity of the former steelworks, it is essential to know how streams flowing into them get into the River Tees. From left to right, Holme Beck, Knitting Wife Beck and Boundary Beck drain the red COMAH sites. Holme Beck and Knitting Wife Beck converge into the Cleveland Channel. This channel flows around the back of SLEMS, then feeds into the Lackenby Channel. Boundary Beck feeds directly into the Lackenby Channel. The Lackenby Channel then drains into the River Tees at the Lackenby Outflow. This outflow, therefore, is Ground Zero for water drained from two coke plants, the BOS Plant, and all of the red COMAH sites shown on the first map. The Lackenby Outflow is just over three miles from where the UKD Orca started dredging at 8:30 am on 25 September 2021.
Mudbath
But water doesn’t get into the Tees solely via these channels. The drone shot a few paragraphs above, looking north across the former South Bank Coke Ovens site, shows a scene of chaos. Earth bunds, created to prevent run-off, have been compromised by heavy plant driving across them, and water leaks away. If you are charged with managing territory known to contain high levels of PAHs as a legacy of iron and steelmaking, it would be wise not to let it deteriorate until it resembles a First World War battlefield, with water running off randomly in all directions.
To be continued…
In PART THREE of this article, I’ll describe the events of 25 September 2021, the genesis of the mass crustacean mortality event.
Thanks to Dr Simon Gibbon for providing extensive research.
Cinema release
All Rivers Spill Their Stories to the Sea (2026 – 12A – 1h 39m. Director: Jeanie Finlay) Official trailer here
UK Theatrical Release: October 23, 2026, includes ARC Stockton Arts Centre.
ARC showing times as follows: Fri 23 Oct, 7pm – Sat 24 Oct, 4pm – Tue 27 Oct, 6pm – Wed 28 Oct, 2pm
Have your say
To make a public representation to the MMO regarding PD Teesport Ltd’s licence to dispose of dredged materials, click this link and enter the following case reference: MLA/2026/00358. Representations can be made up to 11:59pm on 9 November 2026. Or contact your MP using this link.
Support the North East Fishing Collective
Crowdfunder here

Friends of Bylines Network
There has never been a greater need for grassroots journalism that investigates the stories that really matter, holds power to account and champions the voices of everyday citizens. We are proudly powered by volunteers but what we do isn’t free.
STAND WITH US for independent, citizen-led journalism that makes democracy stronger, and you will even get some exclusive benefits.