Back in May 2023 I wrote about how Ben Houchen manipulates the media into running puff-pieces about infrastructure projects that will never happen. So, as we head towards the Tees Valley Mayoral Election on 2 May, has the situation improved? Okay, you’re ahead of me, but let’s get down to cases:
Gravy train
After a breathless screed of Facebook announcements from 2 January onwards, Ben Houchen finally unveiled his £1billion transport plan for the Tees Valley region on 15 January. Keen-eyed local journalists such as Leigh Jones of the Yorkshire Post soon began to question the maths behind Ben’s statement, and he angrily lashed out at the nattering nabobs of negativism constantly Talking Teesside Down™, insisting that he really had £1 billion in new money. However, the dust has settled a bit since then. The reality is even worse than we thought at the time.
I’ll do the maths
So, the £1 billion of new HS2 cash, actually £978m, consists of allocations from the Department for Transport over ten years, from the Fiscal Year 2022/2023 until 2031/32. The cash is split into two tranches – CRSTS1 from 2022/23 to 2026/27, followed by CRSTS2 from 2027/28 to 2031/32. We’re coming to the end of Fiscal Year 2023/24 now, and £200mn of this cash has already been spent, so there’s £778mn remaining. Of this £778mn, £617mn had already been allocated to the TVCA by Jeremy Hunt in the 2023 Budget. This was the full cash allocation for CRSTS2, and it had already been accounted for when Rishi Sunak cancelled HS2 seven months later on 4 October 2023. So the actual new money available falls to £161mn.
Salami slicing
But, it’s about to get worse because, on 15 February 2024, Chancellor Jeremy Hunt announced that he was going to cut taxes by £6bn in the 2024 Budget by cutting 0.25% from departmental budgets for fiscal year 2025/26 onwards. This will reduce the remaining allocation to TVCA for the seven years from 2025/26 through to 2031/32 by about £2mn. So this reduces the available new cash even further, from £161mn to £159mn.
Dutch auction
So, in the world’s worst Dutch auction, £1bn in new money became £978mn, then £778mn, then £161mn and finally £159mn. With this £159mn, Ben is going to build a new general hospital in Stockton, the Darlington north bypass, widen the A689 and the A19 Tees Viaduct, improve a railway freight line, bring in autonomous vehicles, build a new park and ride at South Bank railway station and a lorry park at Redcar. Something’s got to give, and tram fanatics are dismayed by rumours that funding for the 15 new electric trackless trams has already been cut so drastically that the trams are going to be replaced with Tees Flex minibuses. The new ‘superstops’ at Middlesbrough bus station may also be in jeopardy.
Gold plating
But what of the ongoing infrastructure schemes? The refurbishment of Hartlepool railway station was due to be completed by June 2023. In September 2022, Sue Kirby of the Teesside Gazette gushed that it would be ready for the Tall Ships Race in July 2023. A slight slippage in the schedule there, we can forgive that. Shockingly, seven months after the last tall ship sailed, they still haven’t completed the job. The author visited the site on 12 February. Steel cladding which had been added to the footbridge a few weeks ago now appears to have been removed. Industry insiders will be familiar with ‘gold plating’, an industry phrase for a swindle contrived by clients and contractors to change specifications halfway through a contract in order to steal taxpayer money by inflating the budget and extending the schedule. Over at Middlesbrough railway station the refurbishment there, which escalated in cost from £3mn to £35mn, is taking longer than the pyramids. There are also rumours that the Darlington railway station refurb is being delayed while wildlife experts deal with a rare species of slug.
.
South Bank Quay gets a new factory*
*Terms and conditions apply. Truth content may be diluted. By Saturday 4 February, Ben Houchen was feeling the pressure after the most disastrous week of his seven year tenure. The attempt by Houchen and MIchael Gove to whitewash the Tees Valley Review report had been blown apart by a ten minute car-crash interview with Victoria Derbyshire on Newsnight (the clip starts at 24:12). So Ben resorted to a time-honoured tactic. He contacted some national media outlets with a story about a new factory to be built by Ørsted at South Bank Quay in Teesside Freeport. The Times duly reported “A boost for Ben Houchen” no less. But things fell apart in real time when the Teesside Gazette did their annual fact check of a planted story from Ben Houchen and the TVCA. They spoke to Ørsted, who confirmed that there was no such project. It seemed that Houchen had made the whole thing up.
Easter egg
Close Houchen watchers were reminded of an incident two years previously when, on Easter Monday in 2022, Ben Houchen rang Mike Hughes of the Northern Echo from his home phone with an exclusive about a new cable factory which would bring 1,000 jobs to Teesside Freeport. Scott Hunter of Tees Valley Monitor debunked this nonsense the very next day, but Houchen didn’t withdraw it. An incredible 15 months later, Houchen contacted the local media with an update. Due to Middlesbrough MP Andy McDonald Talking Teesside Down™ about the ongoing Teesworks corruption enquiry, the new cable factory wouldn’t be coming to Teesside Freeport after all, and 800 jobs would be lost. In the intervening period between April 2022 and July 2023, 200 phantom employees had been laid off, and Redcar Jobcentre had to bring in a priest to perform an exorcism when the poltergeists wouldn’t form an orderly dole queue.
Careful – it could be a trap
In December 2022, Ben exchanged a free trip to the FIFA World Cup Semi Final, courtesy of the Qatar Foundation, for a 1000-job clean energy campus and a bridge between Manhattan and Brooklyn.
Digging for victory
Houchen has been running a long-term re-election campaign. In August 2023 he announced, without consulting local residents or Redcar and Cleveland Council, that he was going to spend £450,000 and take six months to rip up the tarmac on Marine Parade in Saltburn to provide 125 new parking spaces. The people of Saltburn were up in arms when they realised that the whole point of the exercise was to provide Ben Houchen and Middlesbrough South and East Cleveland MP Simon ‘ECHR’ Clarke with a string of ‘Bob the Builder’ photo opportunities in the run up to the 2 May 2024 Tees Valley mayoral election. Angry residents fought back against Houchen’s overreach by forming Saltburn Against Promenade Changes, persuading Redcar and Cleveland Council to launch a consultation about plans to devastate the promenade. Opposition to the scheme was overwhelming, and Houchen was forced to cancel it only four months after announcing it.
Ben’s boondoggles
For more information on Ben Houchen’s infrastructure projects, search #BensBoondoggles on X (Twitter).
Additional material provided by James Waterson






