• Contact
  • About
  • ISSN 3049-9763
  • Authors and editors
NEWSLETTER SIGN UP
North East Bylines
Advertisement
  • Home
  • News
  • Culture
  • Lifestyle
  • Business
  • Region
  • Opinion
AUDIO
No Result
View All Result
  • Home
  • News
  • Culture
  • Lifestyle
  • Business
  • Region
  • Opinion
No Result
View All Result
North East Bylines
Home Business Economy

Tyne Tunnel toll decision

Tyne Tunnel toll increase decision this week with price increasing by up to 20p per journey

Daniel Holland by Daniel Holland
03-02-2026 09:00
in Economy, Traffic
Reading Time: 4 mins read
A A
Traffic approaching The Tyne Tunnel in South Tyneside

Traffic approaching The Tyne Tunnel in South Tyneside. Photo: NCJ Media.

Share on Bluesky

A hike in the Tyne Tunnel toll looks set to be approved.

Council leaders are due to sign off plans on Tuesday [February 3] that would see the cost of using the river crossing increase by up to 20p per journey.

The toll is currently £2.50 for cars and vans and £5 for larger vehicles, with a 10% discount applied for drivers who use a pre-paid account with operator TT2.

But the price will increase from May 1, if plans are approved by the North East Combined Authority (NECA) cabinet at a meeting in Blyth on Tuesday afternoon.

Proposed price changes

The proposed changes would see the Class 2 vehicle toll, for cars, vans or buses weighing less than 3.5 tonnes, rise by 10p to £2.60. 

The Class 3 toll,  for LGVs, HGVs or buses heavier than 3.5 tonnes, would jump by 20p to £5.20.

For motorists with a pre-paid account, which is the case for approximately 83% of journeys through the Tyne Tunnels, the discounted tolls would be set at £2.34 and £4.68 respectively. 

Behind the price increase

A NECA report warns that failing to increase the tolls would result in a “substantial financial risk” and that the charges are needed “to pay the operational costs as well as the costs of the borrowing that was incurred by TT2 Ltd and the local authorities” in building the second tunnel, which opened in 2011.

Under the terms of the contract agreed with TT2 in 2007, the combined authority pays the company to manage and operate the tunnels via a “shadow toll” – an RPI-linked figure which increases every January and is now £2.70 per vehicle journey through the tunnel.

NECA say that the real toll charged to motorists should remain “as close as possible” to that rate in order for the combined authority fund the shadow toll without incurring major losses and that the financial model for the Tyne Tunnel “assumes that increases to the tolls in line with inflation will be applied when possible to keep pace with inflationary increases in the contract payments”.

Since 2021, an automatic toll system has been in force that has replaced the Tyne Tunnels’ old barriers and toll booths.

Now, drivers must either keep a prepaid account topped up or remember to pay their toll online, over the phone, or in certain shops by midnight the next day.

The switch has sparked controversy, with complaints about drivers being sent £60 fines and  “threatening” enforcement notices for unpaid tolls.

Last month, TT2’s latest financial results showed that it made a post-tax profit of £6.5 million in 2024/25 and paid dividends to its shareholders for the first time ever – handing over £8 million in that year.

The private company has made post-tax profits totalling almost £19 million since 2021, having posted losses in each of the previous four years.

It said that its rise in profits in 2024/25 was due to an increase in the shadow toll and reduced interest payments on debt.

According to TT2 figures, it collected £10.2 million worth of unpaid toll charge notices (UTCNs) in 2024/25 – down from £11.7 million the previous year.

A report to be presented to NECA cabinet members on Tuesday states: “The legislation that governs the tunnels permits the North East CA to revise the Real Toll no more than once every 12 months in normal circumstances. The last toll revision took place in May 2025, so the earliest an increase can take effect is from 1 May 2026.

“Due to changes in RPI, the Shadow Toll that is contractually required to be paid to the concessionaire increased to £2.70 in January 2026 and the Real Toll therefore also needs to increase at the earliest opportunity to maintain an acceptable difference and ensure the account remains in a balanced position and the North East CA can meet its liabilities. It is proposed that the Cabinet approve an increase in tolls for Class 2 vehicles from £2.50 to £2.60 and for Class 3 vehicles from £5.00 to £5.20 to take effect from 1 May 2026.”

CLICK HERE TO DONATE TO OUR CROWDFUNDER

HELP US BECOME STRONGER SO THAT WE CAN CONTINUE TO DELIVER POWERFUL CITIZEN JOURNALISM!

Tags: NECAToll increaseTrafficTT2Tyne Tunnel
Previous Post

The TVCA’s Musical Chairs is an expensive game

Next Post

A winter in Oceania: part eight, Samoa and American Samoa

Daniel Holland

Daniel Holland

Daniel Holland is a Local Democracy Reporter

Related Posts

Number 10 North logo
Business

Mayor works with government for new industrial site for region

by Peter Morris
2 November 2026
House of Commons Budget, Flickr House of Commons, CC 4.0
Economy

The Budget came to the North East. Will it actually land?

by Greng Hassan
2 November 2026
North East mayor Kim McGuinness pictured at Steel City Stadium in Sheffield for a summit discussing a bid for the Olympics and Paralympics for the North of England
Business

Tourist tax feud

by Daniel Holland
30 October 2026
John Healy Budget, Flickr House of Commons
Economy

Budget: “A big day for the North East”

by Peter Morris
29 October 2026
A generic picture of a roadworks sign. Picture from Hull City Council press office
Traffic

Middlesbrough: roadwork roundup

by Daniel Hodgson
28 October 2026
Next Post
Samoa

A winter in Oceania: part eight, Samoa and American Samoa

PLEASE SUPPORT OUR CROWDFUNDER

BROWSE BY TAGS

#BenHouchen Ben Houchen Business Co. Durham community Culture Darlington Durham Economy Education entertainment Environment Equality Finance Funding Gateshead Hartlepool Health History Housing Human Rights Investment Local Lockdown Middlesbrough Newcastle North East Northumberland Online safety opinion Peace Politics Redcar STDC Stockton Sunderland Technology Teesside Teesworks Transport TVCA Tyneside Ukraine Wearside Which?

We are a not-for-profit citizen journalism publication. Our aim is to publish well-written, fact-based articles and opinion pieces on subjects that are of interest to people in the North East and beyond.

North East Bylines is a trading brand of Bylines Networks Limited which is separate to, but allied with, Byline Times.

Learn more about us

No Result
View All Result
  • About
  • Authors and editors
  • Complaints
  • Contact
  • Donate
  • Letters
  • Privacy
  • Network Map
  • Network RSS Feeds
  • Submission Guidelines
  • Download the Bylines Network App

© 2020-2026 North East Bylines. Powerful Citizen Journalism. ISSN 3049-9763

No Result
View All Result
  • News
    • Brexit
    • Education
    • Environment
    • UK News
    • Transport
    • World News
  • Opinion
  • Lifestyle
    • Culture
    • Music
    • Poetry
  • Business
    • Economy
    • Technology
    • Trade
  • Audio
  • Authors and editors

Newsletter sign up

CROWDFUNDER

© 2020-2026 North East Bylines. Powerful Citizen Journalism. ISSN 3049-9763