• Contact
  • About
  • ISSN 3049-9763
  • Authors and editors
NEWSLETTER SIGN UP
North East Bylines
Advertisement
  • Home
  • News
  • Culture
  • Lifestyle
  • Business
  • Region
  • Opinion
AUDIO
No Result
View All Result
  • Home
  • News
  • Culture
  • Lifestyle
  • Business
  • Region
  • Opinion
No Result
View All Result
North East Bylines
Home Business

A new Metro for Teesside: Let’s get serious

The Stockton & Darlington Railway bicentenary invites us to rethink Teesside transport - with a greener future and a true metro

Ray Casey by Ray Casey
21-04-2025 08:00
in Business, Economy, Environment, North East, Teesside, Traffic, Transport, UK
Reading Time: 13 mins read
A A
young woman about to get on a train

https://us02web.zoom.us/j/85055282095

Share on Bluesky

The bicentenary of the Stockton & Darlington Railway can give us pause to reflect on what the next 200 years can bring for transport in Teesside. And it can be a bright future.

Crazy Horses

The great car experiment of the past 60 years has failed. It’s left us with noise and air pollution, and traffic jams, including the infamous ‘Marton Crawl’. New ‘garden villages’ swallowing up countryside. They’re 100% car dependent, and they’re an environmental disaster. Car infrastructure, in the form of roads and car parks, has been allowed to swamp our town centres. 

Free for all

Car owners can set their vehicles down at will, regardless of other citizens, and with complete impunity. Middlesbrough, for example, has one of the worst pavement parking problems in the UK. 

What’s the solution?

Well, locally, Middlesbrough mayor Chris Cooke could choose to apply the law, and stop pavement parking overnight. On a wider scale, councils need to refuse any further planning applications for garden villages. But we also need to provide would-be car drivers with an alternative. Something that every major conurbation in the UK, except the Tees Valley, has got.

On the Buses

Try the bus? I wouldn’t bother right now. Frequently cancelled services, cramped seating, failing aircon, no Wi-fi, a baffling stone age ticketing system, buses fighting for road-space with inconsiderate drivers and people who park anywhere they like. So, as soon as the TVCA has been replaced by a competent organisation, its successor could roll out a reliable bus system. Then a unified ticketing system covering all transport systems, with daily and weekly price caps.

A cycle network?

Sure, but it’s slow progress. Network builders continue to fight a losing battle with a road lobby that won’t give up its space. Some great segregated routes that run out just when you need them most.  And we mustn’t repeat the mistake of putting new cycle routes into the hands of bungling amateurs such as Andy Preston.

Tees Metro

Then we need a turn-up-and-go rail network. The previous proposal for a Tees Metro was half-hearted, promising a small network would only have served a small proportion of the population. It was finally abandoned as part of austerity measures introduced in 2010. The details can be found here.

Be Bold

Right now, the Tees Valley has the oldest rolling stock in the country, and is the only major conurbation in the UK not to have electrified any of its services. We need to fix this with clean, quiet, frequent trains. Services every ten minutes on all routes, or every five minutes on the core routes, so that you don’t need timetables. First of all, a map of the proposed Tees Metro and its four lines:

Familiar, but yet different

All of the proposed stations are shown on the above map, but not all have been labelled for the purpose of clarity. Full details are provided on the following four maps. Anybody who is familiar with railways in Teesside will recognise some of the stations and the routes. But 18 of the 43 stations, and many of the routes, don’t exist right now. They’re either brand new, or they are reopenings of former infrastructure. Much of it disappeared during the ‘Beeching’ era of the mid 1960s. Or so you may have thought. Actually, most of it is still there.

The four lines of the Tees Metro

A description of the four individual lines will follow. This includes details of the major challenges which would be required to reinstate existing routes, and to build some new short stretches of track.

Line 1 – Bishop Auckland to Loftus

Line 1 would be the key Tees Metro route, allowing interchange with all of the other three lines. The line would utilise the existing Bishop Auckland to Saltburn Line, extended through to Loftus. The latter section is sometimes referred to as the ‘East Cleveland Line’

Work required

First of all, reinstatement of double track between Bishop Auckland and Darlington Bank Top stations. A flyover would need to be built north of the latter station to avoid conflicts between the Tees Metro and the East Coast Main line. Due to a penny-pinching decision by the TVCA, only one of the two new platforms being constructed here will be a through platform. Platform 6, currently being built as a terminus platform, would need to be upgraded. This is the disappointing new layout at Darlington, courtesy of Modern Railways magazine:

New stations

There would be new stations at Morton Palms, Teesside Park, Newport and Middlehaven on the existing line. Saltburn station would be relocated, making it a through station instead of a terminus. North Skelton, Brotton, Skinningrove and Loftus would be reopened. I’ve discussed these improvements as part of wider proposals to extend services along the coast to Whitby and Scarborough. You can read these proposals here.

Line 2 – South Circle

Line 2 would be a circular route as shown below. The route would start and finish at Middlesbrough, with two new dedicated platforms being built south of the existing Platforms 1 and 2, using land currently occupied by a car park. Details of the work that would be required to restore this route can be found here.

Line 3 – North Circle

Line 3 would be a circular route as shown below. This part of the Tees Metro would include the largest infrastructure project, the Tees Tunnel. This tunnel would begin east of Port Clarence, then follow a 180° curve before surfacing south of the existing Middlesbrough to Saltburn railway line. Former stations would be reopened as follows: Port Clarence, Belasis Avenue (formerly Belasis Lane), Billingham West (the former Billingham station, closed in 1966), Norton and Newport (just west of Newport Bridge). 

New stations

Stockton Parkway station would be a ‘Park + Ride’ built next to the ‘Blue Bridge’ over the A1027. Teesside Park station has already been proposed by the TVCA. Middlehaven station would serve the eponymous business park and the Riverside Stadium.

Line 4 – Darlington to Hartlepool

Line 4 would run on the same tracks as Lines 1 and 3 for part of the route, permitting interchange at the relevant stations. Greatham station would be reopened, and would also serve the nearby Queens Meadow Business Park. The existing Billingham station would be renamed as Billingham East to avoid confusion with the former Billingham station, now reopened and renamed as Billingham West. Morton Palms would serve the nearby business park of the same name.

Eaglescliffe improvements

The second island platform at Eaglescliffe would be reinstated, allowing the construction of two extra platforms. This would allow the existing platforms to be dedicated to Tees Metro services. The newer platforms would serve Grand Central and Trans Pennine trains. Freight services would also be routed via these lines.

Technical details

The Tees Metro would be electrified using 25kV OHLE and would use an ETCS signalling and control system.

Long distance Services

Northern Rail services from Middlesbrough to Newcastle would utilise the eastern part Metro Line 3 before using a newly-built north to east chord between Belasis Avenue and Billingham East stations. This would reduce the journey time by approximately ten minutes. So, for example, the journey between Hartlepool and Middlesbrough would take 15 minutes instead of 25. Services towards Whitby from Newcastle would continue by reversing at Middlesbrough.

Grand Central Services

Due to improved acceleration of the newly ordered tri-mode trains, services between Sunderland and King’s Cross would call at Billingham West and Stockton in addition to Hartlepool and Eaglescliffe.

Freight services

The quadruple track section between Tees Dock and Eaglescliffe would be reinstated to allow separation of freight and passenger services. This would restore a dedicated freight railway through Teesside that existed from the end of the 19th Century until the Beeching era. Some four-track sections have survived, for example through Middlesbrough station. 

Who would deliver the Tees Metro?

Certainly not the TVCA or Network Rail. Neither of these organisations is fit for purpose. It will have to be done by the newly formed Great British Railways (GBR). But not the half-baked GBR being proposed by Secretary of State Heidi Alexander. This would include “An ongoing role for the private sector”. We’ve been there and got the T-Shirt with nearly 30 years of railway privatisation. It doesn’t work, and the UK Government will need to go back to the drawing board.

Can we afford the Tees Metro?

First, let’s have a look at where some of our money has been spaffed away in the past 15 years: HS2? We won’t get much change out of £80bn while, incredibly, not reaching any of the destinations that it was proposed to serve. Hinckley Point nuclear power station? Another £46bn down the tubes. And the UK Government is about to sign off on another nuclear power station, Sizewell C. 

Don’t do it, Keir

Keir Starmer is claiming a starting budget of £20bn for Sizewell C, but that’s ridiculous. We know that they’ll come back for more than double that. They always do. Unproven science fiction carbon capture? That’ll be £22bn please. Corrupt PPE contracts? £4bn, a mere bagatelle. We may be looking at £10bn for Tees Metro. In the context of all of the above, we can afford it, and Teesside deserves it.

Further Reading

Tees Valley Rail: Beyond 2024 – 30 May 2023

Available here

CLICK HERE TO SUPPORT THE BYLINES NETWORK CROWDFUNDER!

Tags: #S&DR200Bishop AucklandDarlngtonHartlepoolMiddlesbroughRedcarS&DR200SaltburnStocktonTVCA
Previous Post

The Prodigal Returns: Part 15

Next Post

Consett campaigners fight Easter Monday deportation order

Ray Casey

Ray Casey

Corporations and corrupt politicians are setting fire to the planet. We can still stop them. But it doesn't look good so far.

Related Posts

footbridge
Business

Another day at the Teesworks flagship: SeAH Wind publishes its annual accounts

by Ray Casey
14 September 2026
Andy Burnham
North East

Prime Minister Andy Burnham runs Great North Run for Changing Lives

by North East Bylines
13 September 2026
Victoria Viaduct, photo by Ray Casey
Transport

The Tyne & Wear Metro is coming to Washington: here’s a preview

by Ray Casey
13 September 2026
A train decked out in the new GBR livery. Credit: UK Government
Transport

New trains for Middlesbrough

by Daniel Hodgson
13 September 2026
Stockton Middlesbrough map
Teesside

The Teesside we lost

by John Hall
12 September 2026
Next Post
placards outside Derwentside Immigration Centre

Consett campaigners fight Easter Monday deportation order

PLEASE SUPPORT OUR CROWDFUNDER

BROWSE BY TAGS

#BenHouchen Ben Houchen Business Co. Durham community Culture Darlington Durham Economy Education entertainment Environment Equality Finance Funding Gateshead Hartlepool Health History Housing Human Rights Local Lockdown Middlesbrough Newcastle North East Northumberland Online safety opinion Peace Politics Redcar Short Story Sunday STDC Stockton Sunderland Technology Teesside Teesworks Transport TVCA Tyneside Ukraine Wearside Which?

We are a not-for-profit citizen journalism publication. Our aim is to publish well-written, fact-based articles and opinion pieces on subjects that are of interest to people in the North East and beyond.

North East Bylines is a trading brand of Bylines Networks Limited which is separate to, but allied with, Byline Times.

Learn more about us

No Result
View All Result
  • About
  • Authors and editors
  • Complaints
  • Contact
  • Donate
  • Letters
  • Privacy
  • Network Map
  • Network RSS Feeds
  • Submission Guidelines
  • Download the Bylines Network App

© 2020-2026 North East Bylines. Powerful Citizen Journalism. ISSN 3049-9763

No Result
View All Result
  • News
    • Brexit
    • Education
    • Environment
    • UK News
    • Transport
    • World News
  • Opinion
  • Lifestyle
    • Culture
    • Music
    • Poetry
  • Business
    • Economy
    • Technology
    • Trade
  • Audio
  • Authors and editors

Newsletter sign up

CROWDFUNDER

© 2020-2026 North East Bylines. Powerful Citizen Journalism. ISSN 3049-9763