• Contact
  • About
  • ISSN 3049-9763
  • Authors and editors
NEWSLETTER SIGN UP
North East Bylines
Advertisement
  • Home
  • News
  • Culture
  • Lifestyle
  • Business
  • Region
  • Opinion
AUDIO
No Result
View All Result
  • Home
  • News
  • Culture
  • Lifestyle
  • Business
  • Region
  • Opinion
No Result
View All Result
North East Bylines
Home News Environment

Northumberland: centuries of river rerouting to be reversed in major restoration project

Centuries of river rerouting to be reversed in major restoration project

James Robinson by James Robinson
06-06-2025 09:00
in Environment, Rural
Reading Time: 4 mins read
A A
The straight course of the River Breamish in Northumberland, taken from a drone. Photo: LIFE WADER.

The straight course of the River Breamish in Northumberland, taken from a drone. Photo: LIFE WADER.

Share on Bluesky

One of the largest river restoration projects ever seen in the UK is now under way in Northumberland. The River Breamish, in the north of the county, has seen its path straightened over “many centuries” to make way for intensive farming.

This has meant the river has “disconnected” from its floodplain, reducing freshwater species and increasing flood risk. The new project aims to reinstate the “meandering” river system to the lower Breamish Valley.

The project is being led by the LIFE WADER nature-recovery project in partnership with the Environment Agency, Tweed Forum, Natural England and local landowner, Harehope Estate. Organisers say the work will bring “huge benefits for wildlife, ecology and man”.

It forms a key element of the River Till Restoration Strategy. The River Till, a tributary of the Tweed, is home to a number of protected species including otter, Atlantic salmon, as well as river, brook and sea lamprey.

Rewiggling

How to Rewild, a hub for advice on rewilding, describes the process of restoring a river’s original course as “rewiggling”. It states that this can be achieved by digging out a new course parallel to the old one that winds across the original floodplain.

When rivers are disconnected from their floodplain, flood risk downstream is increased and cause poorer water quality. Past landowners tried to reduce local flooding by straightening rivers, but How to Rewild say this was based on a “misunderstanding” of river systems.

Water may flow faster in a straighter, deeper channel – but a “wiggly” river has more storage capacity due to bends and floodplains.

Furthermore, a straightened river means that species must either cling to the riverbed or swim quickly to survive. However, in a more natural watercourse, there is a mix of fast and slow-flowing water, allowing for greater biodiversity.

LIFE WADER comment

LIFE WADER Project Manager, Liz Humphreys, said: “Sadly UK rivers are in crisis – with only 14% nationally in good ecological health. Our rivers have been deteriorating for a long time through intensive management and manipulation.

“Flood embankments, dredging, channel straightening and weir-creation have all reduced floodplain connectivity, removed habitats and obstructed the passage of migratory fish. By taking our cues from nature we can restore natural processes and habitats and bring the river ecosystem back into a state of balance.

“This ambitious project will be one of the biggest of its kind in England and we, as part of a collaborative partnership, are excited to be on the vanguard.  By working closely at the catchment-scale with the Environment Agency and Tweed Forum as well as the landowner and stakeholders we can accelerate progress toward a sustainable balance between land use and nature-recovery for the long term.”

The restoration projects

The Breamish restoration concept has been in development since 2019, with the planning application approved in 2024.  Contractors have been appointed and the major construction works began in late May.

Work will include excavation and diversion of the river into an historic channel, installation of silt traps, shallow ponds, wetlands, embankment breaches and the construction of woody dams.

It is hoped work will be complete by late summer 2025. The scale and ambition of the project will be showcased in a film released next year.

The LIFE WADER project is a five-year £5.8m nature recovery project co-funded by the European Union, due for completion in December 2026. WADER (Water and Disturbance Environmental Restoration) is led by Natural England. It brings together a range of experts to improve the ecological condition of more than 49,000 hectares of river, coastal and marine habitat and improve water quality within the River Tweed catchment and along the Northumberland Coast.

Jim Heslop,  environment programme manager for the Environment Agency in the North East, added: “This exciting project will help return the River Breamish to a dynamic, more natural state and bring a variety of benefits for water quality, habitats and biodiversity.  We’re working with the natural processes of the river to bring it back to life.

“This will be one of the  largest restoration projects of its kind in the country, ensuring that as well as bringing a boost for wildlife, generations to come can enjoy everything this beautiful river in scenic Northumberland has to offer.”

CLICK HERE TO DONATE TO OUR CROWDFUNDER

HELP US BECOME STRONGER SO THAT WE CAN CONTINUE TO DELIVER POWERFUL CITIZEN JOURNALISM!

Tags: Breamish RiverEnvironment restorationNorthumberlandRiver TillRiver Tweed
Previous Post

Fire and Rescue Service go green to help save the planet

Next Post

Unlocking the River Tyne: a thirty-year delay we can no longer afford

James Robinson

James Robinson

Related Posts

Gayle in the shop (Steve Brock Photography)
Business

Vintage in the Tower: giving the past a sustainable future

by North East Bylines
9 September 2026
• The Callerton site near Newcastle Airport was reported on 24 August and is an estimated 400 tonnes
Environment

Environment Agency investigate three illegal waste dumps discovered in the North East

by North East Bylines
8 September 2026
Rainbow Moorland by Ben Hall
Environment

A week to remember wildlife: What’s my legacy?

by Peter Sagar
7 September 2026
Nepal
Environment

Nepal flash flood; a climate warning from the roof of the world

by Peter Sagar
4 September 2026
gardening
Environment

Northumberland Wildlife Trust calls on young people to be Habitat Heroes

by Peter Sagar
29 August 2026
Next Post
Donald Brydon / Aerial view of Tyne bridges and river Tyne. / CC BY-SA 2.0

Unlocking the River Tyne: a thirty-year delay we can no longer afford

PLEASE SUPPORT OUR CROWDFUNDER

BROWSE BY TAGS

#BenHouchen Ben Houchen Business Co. Durham community Culture Darlington Durham Economy Education entertainment Environment Equality Finance Funding Gateshead Hartlepool Health History Housing Human Rights Local Lockdown Middlesbrough Newcastle North East Northumberland Online safety opinion Peace Politics Redcar Short Story Sunday STDC Stockton Sunderland Technology Teesside Teesworks Transport TVCA Tyneside Ukraine Wearside Which?

We are a not-for-profit citizen journalism publication. Our aim is to publish well-written, fact-based articles and opinion pieces on subjects that are of interest to people in the North East and beyond.

North East Bylines is a trading brand of Bylines Networks Limited which is separate to, but allied with, Byline Times.

Learn more about us

No Result
View All Result
  • About
  • Authors and editors
  • Complaints
  • Contact
  • Donate
  • Letters
  • Privacy
  • Network Map
  • Network RSS Feeds
  • Submission Guidelines
  • Download the Bylines Network App

© 2020-2026 North East Bylines. Powerful Citizen Journalism. ISSN 3049-9763

No Result
View All Result
  • News
    • Brexit
    • Education
    • Environment
    • UK News
    • Transport
    • World News
  • Opinion
  • Lifestyle
    • Culture
    • Music
    • Poetry
  • Business
    • Economy
    • Technology
    • Trade
  • Audio
  • Authors and editors

Newsletter sign up

CROWDFUNDER

© 2020-2026 North East Bylines. Powerful Citizen Journalism. ISSN 3049-9763